Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Lead developer of the project to ensure all the below checklist tasks are performed and the status is updated before the Go/NoGo release call.

...

Tasks

Status

Completed date

Comments

Get architect approval on design and develop code for all release repo

Done

13-06-2024

Tasks for the release are detailed, completed and closed

Done

13-06-2024

Branching out of the feature branch to the release branch

Done

13-06-2024

Move the finalized design/approach of all the new features from confluence page to repository doc folder

Done

13-06-2024

DB scripts and upgrade script is written and verified. Make sure proper SQL From and To version is maintained in naming of the file.

Done

13-06-2024

All the API docs in stoplight should have detailed descriptions till the fields level and same need to be exported and moved into the docs folder of the repositories (not to commit in develop branch)

Export a copy of the Open API docs from stoplight and keep it under the docs folder of the repo

Make sure that configuration has the default values as per the release requirements are in release branch

Yes

13-06-2024

Sample Country-specific data and also document the way of inserting/updating them in the database mostly via REST endpoints provided?

e.g. format Database | Table | Sample Data | Module | Module Version | Details | Comments

Yes

13-06-2024

Absolute code freeze including bug fix

Yes

13-06-2024

No open PR in the develop repo for all modules about to get released

Yes

13-06-2024

Dependencies not part of the release list should not have SNAPSHOT references

Yes

13-06-2024

Release branch and develop branch code base are in sync

Yes

13-06-2024

Dependencies of repo and the order in which repos should be built is verified

Yes

13-06-2024

Developer documentation in github is available (.md file)

Yes

13-06-2024

Postman collection is tested by QA, available in the release branch

Review commits from earlier release version in the current release to be checked

Yes

13-06-2024

Provide development architecture to documentation team

Provide technical documentation to documentation team

Release notes prepared by BA is reviewed by developer

Yes

13-06-2024

Check deployability and assure no manual steps involved

Yes

13-06-2024

Version compatibility matrix

Yes

13-06-2024

Repos going in the release consolidated status and approved by Architect

Yes

13-06-2024

Sonar consolidated status

Yes

13-06-2024

Anchor
Sonar
Sonar
Repos going for the release & Sonar detailed status for each repo to be released

...

Repo Name

Repo Owner

Branch Name

Release Version (POM)

Tag Version

Coverage (>80%)

Reliability (0)

Security (0)

Hotspots (0)

Duplications

(Less than 3%)

Data capture date

Comments

android-registration-client

Public

release-0.9.x

0.10.0

0.10.0

Note: Sonar Coverage above 80%, code duplications < 3%, Reliability, Security and Hotspot should be 0

Legend

Anchor
Tasks
Tasks
Tasks:

  • The list of tasks against which the status needs to be updated. Since it’s a template, go ahead to add/modify as required

...